Tiebacks / Soil Nails - Recent Projects

Post Avenue Bridge, Westbury Long Island MTA LIRR DESIGN BUILD

  • DTHH duplex drilling through railway abutment wall into embankment adjacent to underpass to install tiebacks prior to railway bridge replacement.
  • Tracks live above drilling locations
  • Tiebacks
  • 7” dia
  • SoilNails

Contact Us:

Bill Loftus: 516-254-5517

Richard Crockford: 516-254-5504

780 Long Beach Boulevard
Long Beach, NY 11561